| Project |
: |
Mahindra Intertrade Ltd. |
| Location |
: |
Village Gonde, Dist.Nashik |
| Cost |
: |
Rs. 900.00 Lacs |
| Consultant |
: |
M/s Dhananjay Patil & Associates, Nashik |
| |
: |
30 M Span Portals at 16 M Clear Height |
| |
: |
Fabrication work of 750 MT Structural Steel |
| |
: |
Floor Area - 8000 Sq.mt |
| |
: |
12000 cum Hard rock cutting |
| |
|
|
|
|
|
 |
|
 |
| |
|
|
| Project |
: |
Bridge across Godavari River |
| Location |
: |
Kopargone – Shirdi Highway at Kopargaon, Dist – Ahmednagar |
| Cost |
: |
Rs. 850.00 Lacs |
| Consultant |
: |
Total Length 333 Mtrs. PSC T – Beam Girder,28 Mtrs. Span(11 Span), 14 Mtrs. Hight, Pile Foundation |
| |
|
|
|
|
| |
|
|
| Project |
: |
Bridge across Pravara River |
| Location |
: |
Shirdi – Ahmednagar Highway at Kolhar, Dist. Ahmednagar |
| Cost |
: |
Rs. 700.00 Lacs |
| Consultant |
: |
Total Length 200 Mtrs. in Box Return, PSC Box Girder, 42 Mtrs. 2 Span, 48 Mtrs. 2 Span, 12 Mtrs. Height, Pile Foundation |
| |
|
|
|
| |
|
|
 |
|
 |
| |
|
|
| Project |
: |
Topworth Pipes & Tubes Ltd. |
| Location |
: |
Khopoli-Pali Road, Dist. Raigarth. |
| Cost |
: |
Rs. 3000.00 Lakh (Excluding Cost of Steel & Cement) |
| Consultant |
: |
Industrial Construction 45000 M2 with 3500 MT Steel Fabrication Job, Roof with Castellated Beam Portals of 30 Mtrs. Span, 4.00 Lakhs M3 Mtrs. earthwork, Road Work 45000 M2, RCC Work 35000 M3. |
| |
|
|
| |
|
|
|
|
| |
|
|
| Project |
: |
Graphite India Ltd. |
| Location |
: |
M.l.D.C. Satpur, Nashik |
| Cost |
: |
Rs. 1200.00 Lacs (Excluding Cost of Cement & Steel) |
| Consultant |
: |
M/s Stup Consultants |
| |
: |
Height of Structure 32 M. & span 30 M., Fabrication work of 1500 MT Structural Steel. RCC SILO of 23 Mtr. Height (6 mtr clear Internal, diameter & wall thickness is 20 cm) |
| |
|
|
|
| |
|
|
 |
|
 |
| |
|
|
| Project |
: |
BIG BAZAR & MULTIPLEX |
| Location |
: |
Collage Road, Nashik |
| Cost |
: |
Rs. 425.00 Lacs (Excluding Cost of STEEL & CEMENT) |
| Architect |
: |
OS2 Architects & Associates Pvt. Ltd. Mumbai |
| Area |
: |
10000 M2 |
|
|
| |
|
|
| Project |
: |
Nashik City Centre Mall |
| Location |
: |
Untawadi,Lavhate Nagar, Nashik |
| Cost |
: |
Rs. 1600.00 Lacs (Excluding Cost of STEEL & CEMENT) |
| Architect |
: |
OS2 Architects & Associates Pvt. Ltd. |
| Area |
: |
90000 M2 |
|
| |
|
|
 |
|
 |
| |
|
|
| Project |
: |
Holkar Bridge across Godavari River |
| Location |
: |
Malegaon Stand, Nashik |
| Cost |
: |
Rs. 245.00 Lacs |
| Consultant |
: |
Upstream side of existing Holkar Bridge in Standing water., 20 mtr. Span 7 cast in Situ. |
| |
: |
1500 mm diameter piles up to depth of 14 mtr. |
|
|
| |
|
|
| Project |
: |
Supreme Industries Ltd. |
| Location |
: |
Village Gadegaon, Dist. Jalgaon |
| Cost |
: |
Rs. 1200.00 Lacs (Excluding Cost of Cement & Steel) |
| Consultant |
: |
M/s Bhagwati Consultants, Mumbai |
| |
|
|
| |
|
|
|
| |
|
|
 |
|
 |
| |
|
|
| Project |
: |
S.N.J.B. Engineering College |
| Location |
: |
Chandwad, Dist. Nashik |
| Cost |
: |
Rs. 902.00 Lacs (Including Cost of Cement & Steel) |
| Consultant |
: |
M/s Kalayojan, Mumbai |
| |
: |
Engineering College Building of Area of 15000 m2 |
| |
: |
Spiral Staircase with elliptical cut outs. |
| |
|
|
|
|
| |
|
|
| Project |
: |
Thermal Power Plant for Virangana Steel Ltd., Nagpur |
| Location |
: |
Village Kamrij, Dist. Nagpur |
| Cost |
: |
Rs. 664.00 Lacs (Excluding Cost of STEEL & CEMENT) |
| Consultant |
: |
30MW Thermal Power Plant with Steel Melting Shop (SMS Building), A.C.C. Building S.T.G.Building, A.F.B.C. Building, E.F.P. Building, C.H.P. Building,Water Complex, D.G.Room,Induction Furnace & Stores Building etc. |
| |
|
|
|
| |
|
|
 |
|
 |
| |
|
|
| Project |
: |
KSB Pumps Ltd. |
| Location |
: |
M.l.D.C. Malegaon, Sinner |
| Cost |
: |
Rs. 700.00 Lacs (Excluding Cost of Cement & Steel) |
| Consultant |
: |
Arch. S. R. Patil, Nashik. |
| Area |
: |
12600 M2 |
| |
: |
Manufacturing Shed |
| |
: |
Utility Building, Scrap yard |
| |
: |
Administrative Building |
| |
: |
Internal Roads. |
|
|
| |
|
|
| Project |
: |
Xpro India Ltd. |
| Location |
: |
M.l.D.C. Ranjangaon |
| Cost |
: |
Rs. 1251.00 Lacs |
| Consultant |
: |
M/s Bhonsule Architects, Mumbai |
| Area |
: |
15000 sq.mt. composite structure ACM Building, Reactor, Building, Sheet Plant, Main Plant, Chi many Foundation, ETP Plant, Boiler House,Tank Farms,
Internal Road & Infrastructure |
| |
|
|
| |
|
|
|
| |
|
|
 |
|
 |
| |
|
|
| Project |
: |
Sugen Mega Power Project for Torrent Power ltd. |
| Location |
: |
Surat‚ Gujrath. |
| Cost |
: |
Rs. 841.61 Lacs. |
| Architect |
: |
Munjal Bhatt Architects‚ Ahmedabad. |
| Rcc Consultants |
: |
VMS Engineering & Design Services (P) Ltd‚ Ahmedabad. |
| Area |
: |
5000M2 |
|
|
| |
|
|
| Project |
: |
Sugen Mega Power Project for Torrent Power ltd. |
| Location |
: |
Surat‚ Gujrath. |
| Cost |
: |
Rs. 841.61 Lacs. |
| Architect |
: |
Munjal Bhatt Architects‚ Ahmedabad. |
| Rcc Consultants |
: |
VMS Engineering & Design Services (P) Ltd‚ Ahmedabad. |
| Area |
: |
5000M2 |
|
| |
|
|
 |
|
 |
| |
|
|
| Project |
: |
Sugen Mega Power Project for Torrent Power ltd. |
| Location |
: |
Surat‚ Gujrath. |
| Cost |
: |
Rs. 841.61 Lacs. |
| Architect |
: |
Munjal Bhatt Architects‚ Ahmedabad. |
| Rcc Consultants |
: |
VMS Engineering & Design Services (P) Ltd‚ Ahmedabad. |
| Area |
: |
5000M2 |
|
top |
| |
|
|
| Project |
: |
Hydro Power Plant for DLI Power Ltd. |
| Location |
: |
Darana Dam, Dist. Nashik. |
| Cost |
: |
Rs. 746.00 Lacs |
| Consultant |
: |
7 MW Hydro Power Plant, 22 Mtrs. Below Ground Level, 25000 M3 Rock Cutting Below Ground Level |
| |
|
|
| |
|
|
|